The floor was built in a day.  4×8 Sills put in at 6am. Floor joists in another hour or two. Then the plywood subfloor.  The speed was impressive.  It hasn’t rained too much during working hours, but the evenings have been torrential.  The good news is the site grading seems to be doing ok – no flooding.  The bad news is all the wood has been getting wet.  Im a bit worried in particular about the 2×12 exterior walls (yet to be installed, but the wood has been getting soaked for two days now).  Any warping will be annoying because I intend to install shelving within the thickness of the 2×12 wall, and the waviness would be quite visually distracting.  We’ll see pretty soon.